Services › PTF- & Behavior-Reference-Pilot
Stage 3 · Proof

PTF & Behavior-Reference Pilot

Prove method and benefit on a real machine: the process is described as a Behavior Reference, formally checked and validated with documented before/after.

4–8 weeksone machineValue proofoptional Studio & HMI
FOR WHOM & WHY

Proof, not a slide

For whom

For engineering and maintenance who want to prove the value on a critical machine before the big rollout.

The problem

Roadmaps only convince with proof. The pilot delivers a released Behavior Reference on a real machine and a documented before/after value — the basis for the investment decision.

THE FLOW

Six phases — from baseline to reference release

Each phase has a deliverable and a quality gate.

Phase 0

Setup & baseline

Confirm pilot machine, process docs, before KPIs.

Result: pilot setup, KPI baseline
Phase 1

PTF evaluation (4 steps)

Process, technology, overall rating, audit report.

Result: PTF audit report, maturity
Phase 2

Behavior Reference

Model the process model (= BR) from the clarified PTF.

Result: BR, test/acceptance criteria
Phase 3

Validation & test cases

Check BR against test cases, close deviations.

Result: test record, released BR
Phase 4

Value proof

Capture after KPIs, compute reduction per driver.

Result: value proof (before/after)
Phase 5

Report, reference, handover

Result report, reference release, exit gate.

Result: pilot result report, reference
SCOPE

What's included — and what's not

Included

  • PTF evaluation (4 steps)
  • Process model (= Behavior Reference)
  • Test & acceptance criteria
  • Pilot KPIs & value proof
  • optional: Selmo Studio & HMI

Not included

  • Full machine implementation
  • Rollout across multiple machines (Stage 4)
THE PTF METHOD

Four steps to formal describability

The PTF checks whether the process description suffices to describe behavior formally — with a traffic-light logic.

1 · Process evaluation
Make action and reaction explicit per step.
2 · Technology evaluation
Map technology to action/reaction.
3 · Overall evaluation
Feasibility (action) and measurability (reaction) per unit module.
4 · Audit report
Maturity L0–L5 per unit module, open points marked.

Traffic light: green = action & reaction explicit · yellow = partial · red = action or reaction missing.

YOUR RESULT

The pilot result report

A structured report with documented value — the basis for full implementation.

  • Management summary
  • Pilot scope & approach
  • PTF result per unit module
  • Behavior Reference
  • Test & acceptance results
  • Value proof (before/after)
  • Risks & open points
  • Recommendation & next stage
  • Appendix

Documented value, released BR

Value is tracked as a before/after measurement with assumptions marked openly. The result is a customer-confirmed Behavior Reference and a reference release.

Confidential · for you only
Duration
4–8 weeks (one machine)
Prerequisite
Completed WhiteBox Assessment
Next step
BDM Engineering Project (Stage 4)
Request a pilot

Delivered to aproven delivery standard(Selmo delivery playbook) based on the patented Selmo method. In use on demanding lines — including Bosch and Red Bull.

Ready for the proof?

In an intro call we pick the pilot machine and clarify baseline and goal. Free and without obligation.

Request a pilot