Service 02 · WhiteBox Assessment

Where conformity is decidable today.
And where behavior lacks a reference.

Survey · Rating · Maturity · Path of measures

The WhiteBox Assessment does not rate your line and does not rate your team. It establishes which of your requirements on machine behavior are decidable today — and which are only a matter of judgment. The result is a rating, not a grade.

01 — Why this is needed

A passed acceptance test is a snapshot
of a sample.

It holds for the section that was checked and for the moment it was checked. What was never observed has not been tested — it simply did not come up. And any later change voids the evidence without anyone noticing. Before any of that can change, it has to be established where this condition actually applies today.

The blind spot

No one knows how large it is

Without a reference there is no way to say what share of possible machine behavior was ever checked. The question is not whether gaps exist — but where they are and which of them you can carry.

A gap you know is a risk. A gap you do not know is an assumption.
The starting point

The finding comes before the method

An assessment is not a pre-sale for a project. It can also conclude that a section of the line needs no action at all — and that statement is worth its price, because it prevents an investment.

WhiteBox does not mean you can see the code. WhiteBox means conformity becomes decidable instead of a matter of judgment.
02 — What you get

Four steps
that presuppose nothing.

The assessment works with what is there: your documents, your line and the knowledge of your people. It requires no preparation and no change of tooling.

01
Survey

Taking stock at the object

We review functional descriptions, HMI specifications, parameter tables and acceptance documents, and talk to the people who know the line. No remote questionnaire — the statements are formed at the machine.

02
Rating

Decidable or a matter of judgment

Each behavioral requirement is rated: directly decidable, indirectly, conditionally, or not decidable. These four levels are the core of the result — they say what you could check against today and what you could not.

03
Maturity

L0 to L5 instead of a grade

The line is placed in the six maturity levels: BlackBox, Described, Explicit states, Decidable, Lifecycle, Architecture. The turning point is Decidable — before it everything is description, after it evidence begins.

04
Path of measures

What first, what not at all

Not every gap has to be closed. The path names which steps make the biggest difference, which can wait, and which parts of the line may stay exactly as they are.

03 — The result

A report you can keep using
without us.

The result is yours and is written so that someone else can read and check it. It states where each judgment came from and what would refute it.

The assessment delivers a rating, not a recommendation to hire us.
It can conclude that the next sensible step lies with you and not with us. A finding that can only point one way would not be a finding.
Rating report

One of the four levels per requirement, with reasoning and the document or observation that supports it.

Maturity profile

The placement in L0 to L5, separated by section of the line, so that inconsistency across the plant becomes visible.

Gap list

The places where behavior has no reference — ordered by impact, not by effort.

Path of measures

A proposal for the sequence, with the next checkable step and what it presupposes.

Open assumptions

Anything we could not establish is marked in the report as an assumption — not as a result.

04 — Process and gates

Three phases,
one decision at the end.

A gate is a decision, not a date. The assessment leads to exactly one: whether the intent is determined well enough for engineering to start without silent assumptions.

Phase
What happens
Gate
Preparation

Bounding the section of the line under review, collecting documents, clarifying contacts.

On-site survey

Review, conversations and observation at the line. One to three days depending on scope.

Analysis and rating

Rating per requirement, maturity profile, path of measures, handover in conversation.

Gate 0

05 — Scope

What is included
— and what is a different service.

An offer does not become stronger by covering everything. It becomes stronger when its edge is known.

Included
Survey and analysis

Document review, conversations, observation at the line, rating, maturity profile, path of measures.

Handover in conversation

The report is not mailed, it is discussed — with the people who will work with it afterwards.

Right of use

The report is yours and may be used internally and towards third parties without asking us.

Not included
No modeling

Creating a released Behavior Reference (BR) is the PTF- & Behavior-Reference-Pilot.

No implementation

Derivation and verification against the reference are the Behavior Defined Machine (BDM) Engineering Project.

No enablement

Qualifications for your team are part of Certification & Training.

No conformity assessment

The assessment provides material for the evidence trail. Conformity assessment remains with the machine builder.

06 — Where this fits

Where this service sits
— and what comes before and after.

The order is the path, not the revenue. The assessment is the second step: it establishes where you stand. The Behavior Reference (BR) is not after-the-fact documentation of the code. It exists before the code — which is why modeling comes after this, not before it. Verification asks: was it built right? Validation asks: was the right thing built? The assessment answers neither question. It establishes whether the first one can be answered at all today.

What the method does not do

Decidability presupposes technology. Where no reaction is detectable, nothing can be decided formally either — the method makes that visible, it does not remove it.

The question every assessment starts from

Which document do you check against to know whether the machine behaves correctly?

Discuss this question

15–30 minutes. We bring the answer, not the presentation.